| 1. Drum Construction |
Single continuous steel cylinder |
Three concentric nested cylinders |
| 2. Plant Floor Space (Footprint) |
Long: 12 to 25 meters length |
Compact: 5 to 10 meters length (50% less) |
| 3. Thermal Efficiency |
60% to 70% |
75% to 85% (High heat retention) |
| 4. Solid Fuel Savings (Coal/Briquette) |
Baseline fuel consumption |
Saves 20% to 30% fuel per ton |
| 5. Maximum Particle Feed Size |
Up to 50 mm (Stones, large lumps) |
Strictly under 5 mm (Granules, sand, sawdust) |
| 6. Shell Outer Surface Temperature |
Hot (80°C to 140°C uninsulated) |
Cool (45°C to 65°C, minimal radiation loss) |
| 7. Internal Flight Accessibility |
Easy entry for internal maintenance |
Limited access to inner concentric tubes |
| 8. Maximum Operating Temperature |
Up to 850°C (High-temp calcining) |
Up to 600°C (Differential thermal expansion) |
| 9. Civil Foundation Requirements |
Long multi-pier RCC foundation |
Compact single-frame concrete foundation |
| 10. Exhaust Dust Load |
Standard particulate carryover |
Lower dust carryover due to tortuous flow path |
| 11. Initial Capital Cost (₹ INR) |
₹5 Lakh to ₹28 Lakh+ |
₹7.5 Lakh to ₹35 Lakh+ |
| 12. Typical Applications |
Heavy ores, coal, uncrushed sand, limestone |
Fine silica sand, M-sand, sawdust, biomass |